Whiteman Road KPS Culvert Replacement (CRP 5829)

Location pin
Rolled up paper icon

What's Happening

Engineering: Pierce County is in the final stages of design engineering for the project. 

Land: Right-of-Way and/or Temporary Easements are being acquired.

Survey: A topographic survey has been acquired.

Necessary environmental permits will be obtained.

About the Project

Planned improvements for Whiteman Road KPS - Culvert Replacement (CRP 5829) are intended to repair a failing culvert under Whiteman Road KPS. Improvements will include sealing all joints within the culvert with rubber sleeves.

Project Timeline

Fall/Winter 2018: Project construction, single lane closures may occur.
Contact Us
Send a message arrow
Kraig Shaner, P.E.
Bridge Supervisor
Phone: (253) 798-2764
4301 South Pine Street, Suite 628
Tacoma, WA 98409